The Permit Process for Commercial Tenant Improvement Projects- (continued)

General Notes & Details-

Each jurisdiction will also normally have a list of other general notes and requirements that they want to see imprinted on the plans for your submittal.  You can usually just copy these notes verbatim from the list they provide.  These notes can be quite lengthy and will effect how and where you must place different pieces of equipment, plumbing, etc. as well as the required types of finished wall, floor, and ceiling materials for the different spaces and functions in your project.

The Building Department-

The Building Department concerns itself mostly with issues of life and safety within and immediately surrounding a building. These include compliance with Building Codes, which also includes structural stability, energy efficiency, lighting and ventilation requirements, plumbing, electrical, mechanical, material specifications, and other items relating to public safety. Specific to commercial buildings will be the regulations that come from the Americans with Disabilities Act (the ADA), this being an entire subject in and of itself.  Your plans to this department for most tenant improvement projects, will not usually require a lot of structural information, as most of this has generally been taken care of in the permitting of the original building.  But there are other issues that will need to be addressed.

 

The Site Plan-

Generally, the Site Plan for a tenant improvement project can be very simple, mostly just indicating where within the context of the larger building or group of buildings your project is located.  You may also be asked to confirm or verify the available parking for your building or group of buildings.

Title 24 Report-

Even for a tenant improvement project, you will usually be required to provide a Title 24 report, at least for any new and/or modified lighting in your project.  The Title 24 report for any existing heating and/or cooling equipment will usually have already been provided in the permitting for the original building, unless you intend to modify and/or upgrade the existing heating and/or cooling system for some reason.  To obtain this report, you will need to provide the consultant with a Lighting Plan, Mechanical Plan, and/or Reflected Ceiling Plan.

Non-Structural Details-

Much of the time, tenant improvement projects will include non-bearing interior walls, and perhaps even ceiling soffits of some kind not included with the original building "shell".  Though these are not generally considered major structural components, there construction and attachments can be important for public safety so you may be asked to provide details for these items.  For any soffit or significantly long un-braced wall or other items, it may be wise to consult a structural engineer about these details in at least a limited way.

Plumbing Plans-

Plumbing, especially for food-service oriented businesses, can be quite complex so it may be required that you provide a completely separate plumbing plan and some diagrams to more fully illustrate these items.  There will be separate grease lines and waste lines that the different plumbing fixtures may be connected to in different ways so these details and diagrams can be quite a bit more involved than in typical residential plumbing.  You may even be require to hire a separate consultant for this area as well.

Public Works Department-

The Public Works Department mostly concerns itself with public areas such as sidewalks, driveways, streets & roads and infrastructure/utilities issues such as water, sewer, electrical, gas, etc.  They will typically play a much larger part in the plans for a new commercial building than in a residential one, but for tenant improvement projects, most, if not all of these issues should have already been addressed during the permitting of the original building, and should not play a significant role in a tenant improvement project.

Fire Department-

Though most of the major Fire Department issues will generally have been taken care of during the permitting for the main building, there will still be a few issues that this department may want you to address as part of your tenant improvement.  Mostly this has to do with providing a Lock Box where you can store a key to your tenant space in a locked box located at the front of the building so they can get inside in case of a fire or other emergency.  There may also be additional requirement for exiting, lighting, and signage that would all be related to escape from your space during a fire or other emergency.  This department will either provide a list of the required items to you ahead of time, or this list may be submitted to you as part of the corrections from the Building Department.

Time Lines-

Your Health Department review will generally take about 2 weeks.  There may be requested corrections to your plans, and then when you re-submit, the second review, and hopefully approval, may take another two weeks.

The time it will take for the building permit review will vary quite a lot, depending on the size of the project and the current workload of your local department.  It can take from days to weeks, to a couple of months depending on these unknown factors.  Again, you may be asked to revise your plans according to a list of corrections, re-submit the plans, and then wait a couple of more weeks after that for approval.  Building Department approval will depend on prior Health Department approval, and they generally will ask for a set of stamped, approved plans from the Health Department as part of the final, corrected submission to the Building Department.

Costs-

Health Department fees will be based to some extent on the size of your project, but mostly keyed to the length of time they think it will take to sufficiently review your project.  Provided with at least a rough plan, they should be able to give you some idea of what those fees might be before you proceed further with your plans.

Building permit fees are based on several factors, including but not limited to, square footage, project valuation, and other factors. When you submit your plans, the Building Department will generally evaluate your plans there on the spot and calculate your fees accordingly.  Once that total is calculated, you will generally only be required to pay a certain part of the total up front, the remainder being due once the permit is ready to issue.

If you are interested , I offer a low-cost feasibility analysis to help you in planning your tenant improvement project.

<Previous 1 2

 

 

 

 

 
COMMERCIAL-
  Permit Process Design Principles Costs

 

LINKS-
  Government

Local Builders

Real Estate

CONTACT
Home Basic Design Principles The Permit Process Construction Costs About The Site

©2008 Bryce Engstrom: Architect